| System | Typical installed cost | Ongoing | |---|---|---| | Aerobic treatment unit (ATU) | $10,000–$20,000 | maintenance contract + air pump every 5–10 yrs | | Mound / raised fill | $12,000–$25,000 | same as conventional | | Drip irrigation dispersal | $12,000–$25,000 | filter and pump service | | Low-pressure dosing | $10,000–$18,000 | pump service | | Performance-based (engineered) | $15,000–$30,000+ | per design |
Brevard specifics. An ATU upgrade runs $10,000–$20,000 installed, before grant installed. Inside the Indian River Lagoon program area, the county's Septic Upgrade Grant pays up to $20,000 of that, with a $6,000 minimum for every eligible parcel — which turns a $15,000 job into a small out-of-pocket for many homeowners. Ongoing cost is ~$375/yr (DOH operating permit + twice-yearly contractor maintenance). Full breakdown on the grant page.
When you're required to go advanced: the county site evaluation says so. It is not a contractor upsell — the sanitarian's finding controls what can be permitted. If a contractor proposes an advanced system before the county has evaluated the site, ask why.